Before you accept a solar size in Halifax, MA, ask to see it against the heat pump and EV you plan. Solar Savings Solutions is a solar installation service that would quote today's use and next year's, show what the smaller array leaves you buying, and price the solar alone.

  • For Halifax homes planning a heat pump or EV
  • Two sizes: today's use and next year's
  • See the shortfall before you sign
  • 5.0 from 5 reviews
  • Halifax, MA
  • (508) 237-2623

Halifax, Massachusetts

Solar sized for the heat pump you are about to add

Solar Savings Solutions installs on the South Shore and the Cape edges, where a heat pump or an electric car is usually the next purchase. We model today's use and next year's, so the array is not undersized the moment the boiler goes.

What customers say

Solar Savings SolutionsSolar design and installation · Halifax, MA

Serving Halifax and nearby towns

★★★★★5.0 from 5 Google reviews

What we do

What we do

  1. Future-load sizingToday's kWh and next year's, modelled side by side.
  2. Heat pump modellingThe winter load a cold-climate heat pump will add to the bill.
  3. EV charger wiringThe circuit, the charger and the load calculation, priced separately.
  4. Rooftop solarPanels and layout to the larger of the two loads.

Call or visit

Talk to us

Phone(508) 237-2623Call to book an assessment.
Office32 White Island Rd, Halifax, MA 02338Parking on site.
EstimatesFree, in writingDesign and price as separate documents.

Get your free quote

Why homeowners pick us

Why homeowners pick us

  • Sized forwardAn array built for last year's bill is undersized for next year's.
  • Separate linesCharger, heat pump and panels priced apart, so you can stage them.
  • Free written estimateA design and a price before you commit to anything.

Our story

Our story

  1. Installing across Halifax, Pembroke, Kingston, Plymouth and the South Shore.

Next-year sizer: Column A against Column B

Enter today's use and what you plan to add. Column A sizes solar to the house today; Column B sizes it to the house after the heat pump and EV. It runs on this device and nothing is sent.

kWh/yr
Add up 12 months of kWh from your bills.
miles
Enter 0 if no EV is planned. Counted at 0.30 kWh per mile.
kWh/yr
Placeholder. Use your contractor's heat-load figure; 0 if none.

Column A: today

6,840 kWh a year

5.07 kW DC

12 × 430 W panels = 5.16 kW DC

Column B: next year

16,640 kWh a year (6,840 + 3,300 EV + 6,500 heat pump)

12.34 kW DC

29 × 430 W panels = 12.47 kW DC

9,800 kWha year you would buy from the grid if you installed Column A and then added the heat pump and EV.

  • Today's use
  • Heat pump
  • EV
  • Column B solar

Illustrative calculation. Size is yearly kWh divided by 1,349 kWh per kW DC, EcoGen's statewide Massachusetts production factor (modeled, not measured on your roof), with example 430 W panels. Monthly shapes are illustrative: the heat pump weighted to November through April with some summer cooling, the EV spread evenly, solar following a typical Massachusetts year. Net-metering credits from summer surplus carry into winter. A site assessment and your contractor's heat-load calculation would replace every assumption.

From your bills to switch-on

Proposed service. Step two is where it differs: next year's loads are on the sheet before anyone picks a size.

  1. Bills and plans

    Twelve months of kWh, plus the heat pump, EV and appliances you plan, and when they arrive.

  2. Load forecast

    Each new load becomes a line of yearly kWh, with the source of every assumption stated.

  3. Roof, shade and panel

    Usable roof faces, shade, roof age, and whether the electrical service carries a heat pump, a charger and solar.

  4. Two-column quote

    Column A, Column B, the shortfall line and the solar-only price per watt.

  5. Permits and utility

    Town building and electrical permits, interconnection and SMART, each with a named owner.

  6. Installation and inspections

    Built to the approved drawing, then inspected by the town.

  7. Permission to operate

    The utility's written go-ahead, then a first-winter check against Column B.

Installers in safety harnesses fitting solar panels onto rails on a green metal roof

Size for the house you'll have next year

A quote built from one recent bill, or from last year's twelve, sizes the house as it was. If a heat pump or an EV is coming, that is the wrong year. Both move energy you now buy as oil, propane, gas or gasoline onto the electric meter. A bill-sized array can look right on signing day and fall short the first winter after you switch.

A kilowatt-hour (kWh) is the energy on your bill. System size is given in DC kilowatts (kW DC), the panels' combined rated output. The production factor links the two: the kWh each kW of panels makes in a year. EcoGen's Massachusetts benchmark uses about 1,349 kWh per kW, a statewide figure modeled for Boston, not measured on a Halifax roof. Divide a year's kWh by it and you have a first-pass size.

Annual sizing works in Massachusetts because of net metering. Under the state's net metering guide, credits for power you send to the grid are dollar amounts that never expire and roll over month to month. A summer surplus can therefore carry the November to April months, when a heat pump draws hardest. EcoGen's Massachusetts size table points the same way: about 9 kW for "EV or heat pump", 11 kW for both. Treat those as rough bands. EcoGen's own method notes say people size systems to their own home, roof and electricity price, and that is the job of a sizing sheet.

Hold the forecast to three rules:

  • Take heat-pump kWh from a heat-load calculation, the heat-pump contractor's room-by-room estimate of the house's heat loss, not a rule of thumb.
  • Do efficiency work first. The U.S. Department of Energy's homeowner's guide to going solar notes that efficiency upgrades reduce the solar you need. Air sealing done after the array is sized leaves you with panels for a load that shrank.
  • Stay at or under 25 kW. That keeps the system exempt from the state's net-metering caps and in the smallest SMART rate class. It also matters if your plans slip: according to EcoGen's summary, the 20-year property-tax exemption covers systems of 25 kW or less, or up to 125% of the property's yearly use. An array sized for next year can produce well over 125% of this year's use while the heat pump is still a plan, so the 25 kW test is the one that keeps the exemption simple. The worked example below lands at 12.47 kW.

What we put in writing

How we work. Solar Savings Solutions is a solar service for Halifax-area homeowners; nothing here is an operating offer yet. It would size one installation to your forecast year and give you five documents before you sign.

Document What it answers
Two-column sizing sheet Column A sizes to today's 12-month use, Column B to the forecast after the heat pump and EV. Each shows kWh per year, DC kW, panel count, production with shade assumptions, total price and price per watt
Shortfall line The kWh, and rough dollars, you would buy from National Grid if you installed Column A and then electrified
Roof-fit statement Whether Column B fits. If not, what share of next year's load the roof covers, and the next option: another roof face, a ground mount, or accepting the gap
Service and panel note Whether the panel or service needs an upgrade to carry the heat pump, a Level 2 charger and the solar together, priced as its own line
Responsibility sheet A named owner for the building and electrical permits, interconnection application, SMART enrollment, net-metering form, heat-pump-rate check and meter swap

Three choices would stay with you. Size: Column A, Column B, or the largest size the roof holds. Mounting: roof, or a ground mount when the roof falls short (Halifax adds wetlands, flood and septic checks for those, below). Extras: a service upgrade, roof work, an EV-charger circuit and a battery would each be optional and priced separately, never folded into the solar price per watt. The assessment and the documents would be part of the service. It is one install sized to an annual forecast, and no battery is required for the sizing to work.

The assessment, and what to have ready

The assessment would take about two to three hours on site (Illustrative example; no operator has set a visit length). It would check seven things, in order:

  1. Bill baseline. Twelve months of kWh from your National Grid account.
  2. Electrification interview. Heat pump (whole home or partial, fuel replaced, square footage), EV (model, yearly miles, share charged at home), other electric appliances such as a heat-pump water heater or induction range, and when each arrives.
  3. Load forecast. Each new load as its own line of yearly kWh, with its source stated. Heat-pump use is weighted to November through April; EV charging is spread across the year.
  4. Roof and shade. Usable faces, shade on each, roof age, and whether the forecast size fits.
  5. Electrical service. Panel rating, spare spaces and a load calculation adding the heat pump, a Level 2 charger and the solar backfeed (solar current fed into your panel). The Alternative Fuels Data Center's home-charging guide says an electrician should determine whether your service can support Level 2 charging, and permits may apply.
  6. Utility check. Whether the size fits National Grid's simplified interconnection limit, what a grid upgrade could cost you, and the open question of how credits work on the seasonal heat-pump rate.
  7. Address checks. Historic district, and for a ground mount, wetlands, flood zone and septic leaching field.

What to bring: twelve months of kWh use (online account or twelve bills), the heat-pump contractor's quote or heat-load calculation if you have one, your EV plan, a clear photo of the main panel showing the main breaker's amp rating, and the roof's age or last roofing invoice.

Worked example: Column A against Column B

Illustrative calculation. A Halifax household on National Grid uses 6,840 kWh a year today: 570 kWh a month, the Massachusetts average in EcoGen's v1-2026 data, not a Halifax figure. Next year it plans:

  • An EV driven 11,000 miles a year at 0.30 kWh per mile at the wall: 3,300 kWh. The Alternative Fuels Data Center's example uses 27 kWh per 100 miles; the extra 0.03 covers charging losses, in line with the 84% to 93% charging efficiency fueleconomy.gov gives.
  • A whole-home heat pump at 6,500 kWh, a placeholder, not a typical Halifax figure. Replace it with your contractor's heat-load calculation.

Forecast: 6,840 + 3,300 + 6,500 = 16,640 kWh a year.

Illustrative calculation Column A (today) Column B (forecast)
Yearly use sized for 6,840 kWh 16,640 kWh
Size at 1,349 kWh per kW 5.07 kW DC 12.34 kW DC, rounded to 29 × 430 W panels = 12.47 kW DC
Price at the $3.02/W state benchmark ≈ $15,300 ≈ $37,660
Benchmark band ($2.87–$3.17/W) ≈ $14,550–$16,070 ≈ $35,790–$39,530
SMART at the 2026 rate ($0.03/kWh) ≈ $205 a year ≈ $505 a year (about 16,820 kWh)
Halifax building permit fee, on the benchmark price ≈ $184 ≈ $452
Halifax solar electrical permit fee, on the benchmark price $250 (the minimum) ≈ $377

Shortfall line (Illustrative calculation). Install Column A, then electrify, and the house buys 16,640 − 6,840 = 9,800 kWh a year from National Grid. At 30 cents per kWh, the low end of EcoGen's 30 to 34 cent range for National Grid bills, that is about $2,940 a year, before any seasonal heat-pump-rate discount.

Column B costs about $22,360 more up front at the benchmark, roughly two and a half times Column A. The shortfall line is the number to set against that gap, along with the extra SMART payments. Neither column is automatically right. A household that will not have the heat pump for three years may prefer Column A now; one that has the heat-pump contract signed probably wants Column B. Both columns stay under 25 kW, so net-metering and SMART treatment match.

Roof-fit check (Illustrative example). Column B needs room for 29 panels. If the sunny faces hold only 20, the roof-fit statement would say so: about 69% of the forecast covered (20 ÷ 29), with the remaining options priced. All production here uses EcoGen's statewide factor; yours comes from your roof's shade report.

What drives the price, and the solar-only price-per-watt check

Price moves with system size, usable roof faces and shade, the panels and inverter (the box that turns DC power into the AC your house uses), and roof condition. An electrification-sized quote may also carry a service upgrade, an EV-charger circuit and a battery. Those are real costs, but they are not solar. Leave them in and a fairly priced array looks overpriced.

EcoGen's Massachusetts cost page puts the state benchmark at $3.02 per watt, with typical quotes between $2.87 and $3.17 (State benchmark, September 2026 Edition, prices as of September 25, 2026). EcoGen defines it as a modeled installed price before incentives for a representative home system, paid in cash. No EcoGen figure exists for Halifax itself, so the state number is the yardstick.

Run the check in four steps:

  1. Ask for the solar equipment and installation as one line, with the DC size stated.
  2. Move the service upgrade, charger circuit, roof work and battery to their own lines.
  3. Divide the solar-only line by the DC watts. (EcoGen doesn't say whether its figure is per DC or AC watt; this check assumes DC, as most quotes state size.)
  4. Compare the result with $3.02 and the $2.87–$3.17 band.
Illustrative calculation (Column B quote) Total ÷ 12,470 W
One line: $38,900 solar + $3,200 service upgrade to 200 A + $1,100 charger circuit $43,200 $3.46/W, above the band
Solar only $38,900 $3.12/W, inside the band

Same quote, two readings. The bundled figure could push a buyer toward a smaller array; the solar-only figure shows the panels priced normally. The East Bridgewater page walks through the same split. The benchmark is a cash price, so if you finance, ask for the cash price as well and run the check on that.

Halifax permits, fees and the historic district

Permits and fees

Rooftop solar in Halifax needs a building permit and a separate electrical permit, filed with the Halifax Building Department through the town's online permitting portal. Applications from July 1, 2025 must meet the 10th Edition Massachusetts Building Code.

Under the town's posted procedures, the Building Inspector collects the Tax Collector, Conservation Commission and Board of Health sign-offs, and the contractor files an affidavit showing its Construction Supervisor License and/or Home Improvement Contractor registration plus workers' compensation.

The Halifax fee schedule (effective July 1, 2024):

Permit line Posted fee Who would file it
Building, solar panels $150 minimum or $12 per $1,000 of contract cost Solar contractor
Electrical, solar panels $250 minimum or 1% of cost Solar electrician
Electrical, service change $100 up to 100 A, plus $50 per extra 100 A Whoever does the upgrade
Sheet metal, HVAC system 1% of cost Heat-pump contractor

"Minimum or" most likely means whichever is greater; confirm with the office. On that reading, the 200 A service change in the price example would add a $150 electrical permit ($100 + $50; Illustrative calculation). Solar and storage fees may be adjusted at the inspector's discretion, and unpermitted work pays double. A ducted heat pump would fall under the HVAC line, filed by the heat-pump contractor, so the electrification plan can touch three or four lines on this schedule.

The historic district

Halifax's Local Historic District, which includes Lyonville, covers sections of Plymouth, South, Carver, Thompson and Old Plymouth Streets, up to 300 feet from the road's centerline or to the property line, under the town's Historic District By-Law. The Historic District Commission controls exterior changes visible from a public street, way or park.

If you live on one of those streets, ask the Building Inspector's office first, and ask to see the district map for your parcel. The town's procedures make finding out the applicant's job. Where the by-law applies, no building permit issues until the commission grants a certificate (its written approval, or a finding that review isn't needed). It decides within 14 days whether to review, and within 30 days if it does. M.G.L. c.40C §7 requires it to weigh the state's policy of encouraging solar and protecting solar access. Whether a rear face hidden from the street is outside its control is the commission's call, so allow about a month for that answer.

Ground mounts

If Column B doesn't fit the roof, a ground mount adds three checks:

  • Wetlands. The Halifax Conservation Commission enforces state law and a local wetlands by-law the town calls stricter in some respects. Filing is usually needed within 100 feet of wetlands, ponds or swamps, or 200 feet of rivers and streams, at least 15 days before a meeting.
  • Floodplain. Zoning's floodplain overlay follows FEMA's maps; the town's floodplain maps page lists panels around the Monponsett Ponds, Silver Lake and the Taunton and Winnetuxet Rivers.
  • Septic. The Board of Health bars any structure over the leaching field.

The May 2026 text of Halifax's zoning by-law contains no solar section, and state law bars zoning that unreasonably regulates solar. Confirm ground-mount setbacks with the Building Commissioner.

From signed contract to permission to operate

The order, with each step's owner:

  1. You sign for Column A, Column B or a roof-limited size.
  2. Historic district certificate, if needed (installer, via the Building Inspector's office).
  3. Building and electrical permits through the Halifax portal (installer and licensed electrician).
  4. National Grid interconnection application (installer). Interconnection is the utility's approval to connect your system to its grid.
  5. SMART application (installer, on your behalf).
  6. Installation (installer).
  7. Inspections: electrical final, then building final. Town documents give 24 and 48 hours' notice in different places; book at least a day ahead and confirm with the office.
  8. Permission to operate (PTO): National Grid works on the meter and gives written authority to interconnect. Don't switch on before that letter.
  9. Credits begin, and SMART payments once the system qualifies (National Grid).
  10. Heat-pump-rate check (you and National Grid), once the heat pump runs.

National Grid handoff: net metering, SMART and the heat-pump rate

Halifax is National Grid (Massachusetts Electric) territory on the state's electricity-provider map; check the name on your bill anyway. The town's aggregation program changes your supplier, not the wires utility.

Neighboring towns differ: some Pembroke addresses and all of Kingston are on Eversource, with a different portal and heat-pump-rate contact.

Net metering. At 25 kW or less, the system is cap-exempt, and the value of each credit follows your rate class. That last point is why the heat-pump rate below matters.

SMART is the state's solar incentive, paid per kWh produced. National Grid's SMART 3.0 tariff (effective July 1, 2026) pays systems up to 25 kW AC a flat $0.03 per kWh in 2026 ($0.06 for low-income customers) for 20 years, fixed when the system qualifies. The 2027 rate is not yet set; the tariff says "TBD". Payments need National Grid's written authority to interconnect, and the utility takes title to the system's renewable energy certificates (the tradable proof that clean power was made) for the term.

Interconnection. National Grid's revised tariff is reported to raise the simplified-process limit to 25 kW, and regulators approved a $225 fee for systems up to 25 kW that covers the first $10,000 of any grid upgrade. Check whether both are in force for your application. A bigger, electrification-sized array is likelier to need an upgrade, so ask who pays above $10,000.

Heat-pump rate. National Grid offers a seasonal heat-pump rate with lower distribution and transmission charges on all your kWh from November 1 to April 30. Homes with a Mass Save heat-pump rebate since 2019 are enrolled automatically; others sign up. A heat-pump water heater alone doesn't qualify.

The public pages checked for this page don't settle how National Grid values net-metering credits for a customer on this rate. Ask National Grid in writing before you finalize the size, because the answer changes what a banked summer credit covers in January.

After switch-on: is it delivering Column B?

Ask the installer how you would check that the array delivers what Column B promised:

  • Monitoring: can you see monthly production against the sheet's estimate?
  • First winter: after the heat pump's first season, compare actual use with the forecast.
  • Production estimate: which shade assumptions produced it, and is any of it guaranteed?
  • Warranties: who answers for panels, inverter and workmanship, for how long, and for a roof leak at a mount?
  • SMART: who files, and who gets paid?
  • Change of plan: what if the heat pump or EV arrives late or never? Credits keep rolling over, but an array sized for a load that never comes is money spent early.

Questions to ask any Halifax solar installer before you sign

Use these with any Halifax quote, alongside the quote checklist on this site:

  • Does it show two sizes, one for today's use and one for the heat pump and EV you plan?
  • Is there a shortfall line, in kWh and dollars, for the smaller size?
  • Is the heat-pump kWh from a named heat-load calculation?
  • Is solar priced on its own line with the DC size stated, for the $3.02 benchmark check?
  • Are the service upgrade, charger circuit, roof work and battery separate lines?
  • Does it say whether your address is in the historic district, and who files for the certificate?
  • Does the contractor pull the permits? The town's Homeowner's Affidavit warns that owners who pull permits for hired work lose access to the state's home-improvement guaranty fund.
  • Is the electrical work done by a Massachusetts-licensed electrician, and does the contractor hold Home Improvement Contractor (HIC) registration? Check both yourself.
  • Does the contract meet M.G.L. c.142A §2: registration number, payment schedule, a deposit no larger than one-third of the price or the cost of special-order materials (whichever is greater), no final payment before completion, and notice of your 3-day cancellation right? Ask whether your contract is written under it.
  • Is there a responsibility sheet with an owner for every permit, utility and SMART step?
  • Is the size under 25 kW?

Coverage beyond Halifax, including neighboring towns such as Hanson, covers these towns.

Short answers to common questions

Is there a federal tax credit for home solar in 2026?

Not for a system you buy. The IRS residential clean energy credit page says it is not available for property placed in service after December 31, 2025. Federal credits for heat pumps, for EVs acquired after September 30, 2025, and for home chargers placed in service after June 30, 2026 have ended too. Some installer pages still advertise one; check the date. With a lease or power-purchase agreement, the provider may claim a business credit; ask how that shows in your price.

Does solar save money in Halifax?

It depends on your use, the system's production and how National Grid credits exports, plus the SMART payment. A single savings number hides the choice that matters here. Compare the two columns on your sizing sheet, and the shortfall line between them.

What Massachusetts incentives remain?

According to EcoGen's Massachusetts incentives summary (checked September 30, 2026): a 15% state income-tax credit up to $1,000, a sales-tax exemption on solar equipment, and a 20-year property-tax exemption for systems of 25 kW or less, or up to 125% of the property's yearly use. Confirm the credit with the Massachusetts Department of Revenue before counting on it.

Town guides

Each guide covers that town's wires utility, permit route and quote checklist. We work across all of these towns.

Wires utility from the state's Electricity Providers by Town map (DPU data as of October 2025). Check the name on your own bill.

Get your free quote

Choose your town and what you plan to add. This private preview builds the checklist to take to any installer, including the two-column sizing request.

It runs on this device and nothing is sent. There is no phone line, email or form behind this concept.

What do you plan to add in the next two years?